PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor bathroom roughing Facing South.jpg Continued installing copper piping at the 1st floor Bathrooms 133-136 Facing North-West.jpg Electrical wires for the 2nd Floor VAV boxes Facing North.jpg Electrical wires for the 3rd floor VAV boxes Facing East.jpg Erecting the stone panels at the North Elevation.jpg Installed rebar at the detention cells Facing West.jpg
Previous pageNext page Continued installing copper piping at the 1st floor Bathrooms 133-136 Facing North-West
Continued installing copper piping at the 1st floor Bathrooms 133-136 Facing North-West